Staircase Complete

2005-11-04 1 min read Ninole House marco
Just finished speaking with Brad: the progress on the house seems to be fantastic! I don’t know how much of that I got right, but here is what I remember:
  1. The staircase from the ground floor to the first floor is complete
  2. Some of the interior walls are put in
  3. The cabinets are all moved out of the container and placed in the kitchen
  4. The plumber started working and thinks he’s going to be finished over the weekend

The only surprise (other than pleasant) in all of this was that there were three tubs, not two and a shower basin. Go figure. He’s going to make it work, regardless. Amazing!